| 03/24/2015 | Luke and Bill poured a concrete pad. We constructed foam huts. | Tanner | | | 03/24/2015 | Luke and Bill poured a concrete pad. We constructed foam huts. | Tanner | |
| 03/25/2015 | Grouted the granite tile at the beginning of the day. It seemed set at the end of teh day, so Pat and Tanner installed the full station. Network and GPS timing were working. | Tanner | | | 03/25/2015 | Grouted the granite tile at the beginning of the day. It seemed set at the end of teh day, so Pat and Tanner installed the full station. Network and GPS timing were working. | Tanner | |
| 04/01/2015 | Used the Octans to align the seismometer. The seismometer was centered after the alignment. | | 04/01/2015 | Used the Octans to align the seismometer. The seismometer was centered after the alignment. | Tanner | |
| | 09/09/2015 | Centered seismometer remotely. | Tanner | |
| | 06/17/2016 | Centered seismometer remotely. | Tanner | |
| |
| {{groups:homestake/array:2000c_1.jpg|photo 1}} |
| |
| {{groups:homestake/array:2000c_2.jpg|photo 2}} |
| |
| {{groups:homestake/array:2000c_3.jpg|photo 3}} |
| |
| {{groups:homestake/array:2000c_4.jpg|photo 4}} |
| |
| {{groups:homestake/array:2000c_5.jpg|photo 5}} |
| |
| {{groups:homestake/array:2000c_6.jpg|photo 6}} |
| |
| |
groups/homestake/array/2000-c.1432674316.txt.gz · Last modified: 2015/05/26 16:05 by prestegard